“I guess 27 years of doing all the work outside and dragging a floor jack though the mud will do that,”

“Now firmly in middle age, I wasn't having fun laying in the snow and mud anymore.”

“I've always performed my own vehicle and equipment maintenance and repairs, year round, and sometimes in the snow and mud,”

We also rebuilt several vehicles outside; a 60's vintage Manx style dune buggy, several early Broncos, and a Jeep CJ-5.  All these were stripped right to the frame and assembled with fiberglass bodies, new/rebuilt drive trains and suspension.”

“We cleared the site ourselves (previously wooded), and used a local contractor for the foundation,”

“We laid out the radiant floor, and the contractor came back to pour the floor. The building was mostly assembled by just three of us. We used the Industrial Base Connector system which kept it straight, and I believe made the assembly easier. We also ended up using the insulation package offered by SteelMaster (installed by two of us; probably the most difficult part of the entire project). We use a small propane boiler to heat the floor. All in all, we could not be happier with our decision to go this route.”